Rooney Dam Repair and Fish Passage Improvement Project

Summary

SCH Number
2009068138
Public Agency
Omochumne-Hartnell Water District
Document Title
Rooney Dam Repair and Fish Passage Improvement Project
Document Type
NOE - Notice of Exemption
Received
Posted
6/8/2009
Document Description
The Proposed Project would minimize existing streambank erosion, resurface the dam's concrete sill, and install a multi-tiered boulder weir. Imported riprap would be used to augment the eroded downstream right bank (25 tons of riprap( and the downstream face of the dam (175 tons of riprap). To repair the concrete sill, the District would place a 6-inch thick vertical layer of shotcrete (approximately 16 cubic yards) on the damaged portion of the downstream face of the dam ot protect the exposed foundation of the dam. The fish passage improvement component of the Proposed Project would include the construction of a three-tiered boulder weir to create step pools with no more than one-foot jumps (changes in water surface elevation) between them.

Contact Information

Name
Ron Lowry
Agency Name
Omochumne-Hartnell Water District
Contact Types
Lead/Public Agency

Location

Counties
Sacramento

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301 & 15333
Reasons for Exemption
Existing facilities and Small Habitat Restoration Projects

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.