Sutter Bypass Pumping Plants Control System Rehabilitation Project

2 Documents in Project

Summary

SCH Number
2009062072
Lead Agency
California Department of Water Resources (DWR)
Document Title
Sutter Bypass Pumping Plants Control System Rehabilitation Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
PP#1: AG-80; PP#2: AG; PP#3: Open Space
Document Description
The project will consist of the Design and Fabrication of new pump control systems at each of the 3 Sutter Pumping Plants. There are a total of 14 pumps ranging from 100 to 350 horsepower. This last phase of the pumping plant renovation will consist of installing a modern control system at each plant allowing the pumps to be controlled remotely from the sutter maintenance yard. Acquiring backup generators to supply power in the event of an outage, and upgrading the communication system at the pumping plants. The generators will be housed on a newly constructed foundation built into the levee. The structures at pumping plants 1 and 3 will be 15'x30' and pumping plant No. 2 will be 30'x30'.

Contact Information

Name
Bonnie Green Ross
Agency Name
California Department of Water Resources
Contact Types
Lead/Public Agency

Location

Cities
Yuba City
Counties
Sutter
Cross Streets
Sutter Bypass & Sawtelle O'Banion, & Hwy 20
Parcel #
#1: 25-210-021; #2 21-240-005; #3 13-340-044
State Highways
20, 99, 113
Railways
No
Airports
No
Schools
No
Waterways
Sutter Bypass, Sac River, Gilsizer Slough

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 3 (DOT), California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB), California State Lands Commission (SLC), Caltrans, Division of Aeronautics, Central Valley Flood Protection Board, Department of Toxic Substances Control
Local Actions
flood control
Project Issues
Air Quality, hydro/H2O

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print