Middle Green Valley Development Project (Lake or Streambed Alteration Agreement No. EPIMSSOL-34638-R3)

12 Documents in Project

Summary

SCH Number
2009062048
Lead Agency
Solano County
Document Title
Middle Green Valley Development Project (Lake or Streambed Alteration Agreement No. EPIMSSOL-34638-R3)
Document Type
NOD - Notice of Determination
Received
Posted
6/26/2024
Document Description
The Project is limited to two sites where new outfalls and rock slope protection (RSP) will be installed in Green Valley Creek: At site 1, Mason Road Crossing, there are two existing earthen outfalls on the upstream and downstream sides of Mason Road Bridge. Mason Road will be widened in this area, and to accommodate this widening the existing outfalls will be reestablished and upgraded by armoring the banks of Green Valley Creek with RSP aprons (Exhibit A). The upstream outfall will consist of a trapezoidal area approximately 66.5 feet long and 12 feet wide, covering an area of 781 square feet. This area will be excavated to a depth of 18 inches, and filled with 9-inch diameter Class II angular rip-rap. The outfall will extend from a proposed roadside ditch to the thalweg of Green Valley Creek. The outfall will drop into Green Valley Creek at a 6:1 slope, and will have a center one foot lower than the outer edges. The downstream outfall will consist of a trapezoidal area approximately 103 feet long and 12 feet wide, covering an area of 1,219 square feet. This area will be excavated to a depth of 18 inches, and filled with 9-inch diameter Class II angular rip-rap. The outfall will extend from a proposed roadside ditch to the thalweg of Green Valley Creek. The outfall will drop into Green Valley Creek at a 6:1 slope, and will have a center one foot lower than the outer edges. At site 2, a trapezoidal area approximately 16 feet long and 18 feet wide, covering an area of 266.9 square feet will be excavated to a depth of 18 inches, and filled with 9-inch diameter Class II angular rip-rap (Exhibit B). The rip-rap will surround a 48-inch high density polyethylene or polymer-coated steel pipe conveying water from a proposed stormwater detention basin. Temporary cofferdams made of sandbags surrounded by polyethylene plastic sheeting will be installed at both sites. These cofferdams will be constructed to dewater the western portion of Green Valley Creek while conveying water downstream through the eastern portion. The Project will result in permanent impacts to 2,266.9 square feet and 40 linear feet of stream and riparian habitat; and temporary impacts to approximately 4,450 square feet and 102 linear feet of stream and riparian habitat.

Contact Information

Name
Alexander Single
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Fairfield
Counties
Solano
Regions
Northern California, San Francisco Bay Area
Other Location Info
1. Site one, Mason Road Crossing, is located at Latitude 38.23601 °N, Longitude -122.15590 °W; the northeast ¼ of the southeast ¼ of Section 35, Township 5 North, Range 3 West of the Mount Diablo Base Range and Meridian; U.S. Geological Survey Cordelia 7.5-minute quadrangle. 2. Site two, Stormwater Detention Basin Outfall, is located at Latitude 38.22795 °N, Longitude -122.15200 °W; the northeast ¼ of the northeast ¼ of Section 1, Township 4 North, Range 3 West of the Mount Diablo Base Range and Meridian; U.S. Geological Survey Cordelia 7.5-minute quadrangle.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Solano
Final Environmental Document Available at
2825 Cordelia Road, Suite 100 Fairfield, CA 94534

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.