Litchen Oaks Ranch Pond Restoration Project

3 Documents in Project

Summary

SCH Number
2009062037
Lead Agency
Santa Cruz County
Document Title
Litchen Oaks Ranch Pond Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
6/3/2010
Document Description
Project proponent proposes to restore the existing Quail Hollow Brook pond by removing sediment and distributing sediment onsite, replacing the existing drainage pipes and culvert, and removing and replacing the existing headwall located at the lower pond area. Project construction will entail dewatering of the construction area and installation of a permanent, gravel access road, approximately 12 ft. wide, into southwest side of the pond and installation of a rock apron within Quail Hollow Brook immediately downstream of the culvert headwall/dam to dissipate energy at the culvert outlet during flood events. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement Number 1600-2009-0274-3 pursuant to Section 1602 of the Fish and Game Code to the project Applicants, E. Floyd and Jean Kvamme.

Contact Information

Name
Suzanne DeLeon
Agency Name
Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Santa Cruz
Cross Streets
West Zayante and Quali Hollow Road
Zip
95018
Total Acres
90
Parcel #
074-181-01
State Highways
17
Waterways
Zayante Creek
Other Location Info
City/Nearest Community: Felton

Notice of Determination

Approving Agency
Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print