EA 2009-605; for the Adams Street Bridge General Plan

2 Documents in Project

Summary

SCH Number
2009061098
Lead Agency
City of La Quinta
Document Title
EA 2009-605; for the Adams Street Bridge General Plan
Document Type
NOD - Notice of Determination
Received
Posted
10/12/2009
Present Land Use
Drainage channel / Floodplain / Water
Document Description
The City of La Quinta, in cooperation with the California Department of Transportation (Department) proposes to span the Whitewater River Channel at Adams Street. The proposed bridge improvement will span the Whitewater River Channel at Adams Street. The bridge itself is anticipated to be ~525 ft long and ~76 ft wide. At a minimum, the typical section will include a 6 ft sidewalk on both sides of the bridge, a 12 ft raised curb median island, and 4 travel lanes. The project will also include items such as concrete slope protection, multi-use trail crossing under the bridge at either of the abutments and the City's decorative bridge railings. Other improvements associated with the bridge will include accommodations for a future multi-use trail crossing under the bridge at either abutment. Additionally, two ramps from the top of the concrete slope lining to the bottom of the channel will be constructed to allow for maintenance of the channel bottom by the Coachella Valley Water District, responsible for maintenance of the channel facility.

Contact Information

Name
Wallace Nesbit
Agency Name
City of La Quinta
Contact Types
Lead/Public Agency

Location

Cities
La Quinta
Counties
Riverside
Cross Streets
Adams St, Ave 46 (Westward Ho Dr), Corporate Center Dr
Zip
92253
Total Acres
~2
Parcel #
643-220-005; 600-010-009
State Highways
111
Schools
La Quinta HS
Waterways
Whitewater River Channel; La Quinta Evac Channel
Township
5S
Range
7E
Section
30
Base
SBB&M

Notice of Determination

Approving Agency
City of La Quinta
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print