Eagle Canyon Dam and Debris Basin Project
5 Documents in Project
Summary
SCH Number
2009061065
Lead Agency
Riverside County Flood Control and Water Conservation
Document Title
Eagle Canyon Dam and Debris Basin Project
Document Type
NOD - Notice of Determination
Received
Posted
5/4/2011
Present Land Use
Dry wash, distrubed land/Urban Reserve/Hillside Reserve, General Commercial, & Palm Hills Special Policy Area.
Document Description
Note: 1 CD
The project site is located at the mouth of Eagle Canyon, southwest of East Palm Canyon Drive, in both the City of Palm Springs and the City of Cathedral City. A portion of the project would be sites within Agua Caliente Band of Cehuilla Indians Reservation property. The canyon currently discharges into a wash between Canyon Plaza Drive and Perez Road. The project includes the construction, operation and maintenance of an earthen dam, debris catchment and underground storm drain for the purpose of flood detention and flood hazard mitigation for business and residents located downstream of the canyon.
Contact Information
Name
Kris Flannigan
Agency Name
Riverside County Flood Control and Water Conservation District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Riverside
Cross Streets
Canyon Plaza Drive & East Palm Canyon Drive (Highway 11)
Zip
92234
Total Acres
20
Parcel #
See attached list of APNs
State Highways
Hwy 111
Schools
Cathedral City Elementary
Waterways
Eagle Canyon Wash & West Cathedral Channel
Township
4S
Range
5 E
Section
32
Notice of Determination
Approving Agency
Riverside County Flood Control and Water Conservation District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.