State Route 99 Island Park 6-Lane Project - Agreement 2011-0187-R4

8 Documents in Project

Summary

SCH Number
2009061047
Lead Agency
California Department of Transportation, District 6
Document Title
State Route 99 Island Park 6-Lane Project - Agreement 2011-0187-R4
Document Type
NOD - Notice of Determination
Received
Posted
3/30/2012
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement, pursuant to Section 1602 of the Fish and Game Code, to the Project applicant. Caltrans proposes to construct a new 141 foot wide (four-12-foot lanes in each direction, 23-foot median and 10-foot outside shoulders) by 877 foot long, 6-span Cast-in-Place Post-Tensioned Concrete Box Girder Bridge to replace the existing 90 foot wide by 877 foot long San Joaquin River (SJR) Bridge (Br No 41-0090) which will be removed. The bridge will be widened to the west. The elevation of the beginning of the bridge and the end of the bridge will be the same as existing but there will be a crest at the midpoint of the bridge. This will allow the storm water to drain to the bridge ends and be treated by the bio-swales. The roadway will initially be widened to three lanes in each direction, which will leave two lanes (one each direction) free for future widening to an 8-Lane freeway without further bridge work.

Contact Information

Name
Laura Peterson-Diaz
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Fresno, Madera
Counties
Fresno, Madera
Cross Streets
SR 99
State Highways
99
Railways
SPRR
Waterways
San Joaquin River

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.