Arroyo Grande Creek Channel Waterway Management Program (Amendment to Streambed Alteration Agreement No. 1600-2018-0115-R4)

11 Documents in Project

Summary

SCH Number
2009061030
Lead Agency
San Luis Obispo County
Document Title
Arroyo Grande Creek Channel Waterway Management Program (Amendment to Streambed Alteration Agreement No. 1600-2018-0115-R4)
Document Type
NOD - Notice of Determination
Received
Posted
11/19/2020
Document Description
The Project includes activities related to the annual vegetation maintenance, sediment removal, and other routine maintenance activities along portions of Arroyo Grande Creek and Old Los Berros Creek for the purpose of increasing capacity to a 10-year flood protection to the adjacent properties. The amendment allows work beyond October 31 each year upon written approval from CDFW.

Contact Information

Name
Heather Rodriguez
Agency Name
CA Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
San Luis Obispo County Public Works Department.
Contact Types
Project Applicant

Location

Cities
arr, Arroyo Grande
Counties
San Luis Obispo
Other Location Info
The Project will occur in and adjacent to Arroyo Grande Creek and Old Los Berros Creek, near the City of Arroyo Grande in San Luis Obispo County, California, USGS 7.5 Minute Quadrangle Map Oceano, MDB & M; Latitude 35°06'19.44"N, Longitude 120°35'16.96"W, downstream to Latitude 35°05'57.55"N, Longitude 120°37'19.99"W (Arroyo Grande Creek) and Latitude 35°06'11.04"N, Longitude 120°34'42.77"W, downstream to Latitude 35°06'12.02"N, Longitude 120°35'19.41"W (Old Los Berros Creek).

Notice of Determination

Approving Agency
Julie A. Vance
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print