Water Year 2010 Interim Flows - San Joaquin River

2 Documents in Project

Summary

SCH Number
2009061019
Lead Agency
California Department of Water Resources (DWR)
Document Title
Water Year 2010 Interim Flows - San Joaquin River
Document Type
NOD - Notice of Determination
Received
Posted
9/30/2009
Document Description
Reclamation is proposing to temporarily change Friant Dam operation in WY 2010 (October 1, 2009 through September 30, 2010) to release WY 2010 Interim Flows from Friant Dam in the San Joaquin River and potentially downstream (potentially through the use of the Eastside Bypass) as far as the Delta, as specified in the Stipulation of Settlement in NRDC, et. al. v. Kirk Rodgers, et. al., and as part of the SJRRP. Consistent with a Memorandum of Understanding with the Settling Parties and the State, the California Natural Resources Agency will play a major role in funding and implementing actions called for in the Settlement and in the Act. DWR, along with several other State organizations, will implement actions needed to route WY 2010 Interim Flows through the Restoration Area including the potential use of the Eastside Bypass. The WY 2010 Interim Flows would be recaptured by existing water diversion facilities along the San Joaquin River or in the Delta for agricultural, municipal and industrial, or fish and wildlife uses. The project would not involve construction activities. The purpose of the Proposed Action is to implement the provisions of the Settlement pertaining to WY 2010 and collect relevant data to guide future releases of Interim Flows and Restoration Flows under the SJRRP.

Contact Information

Name
Paula Landis
Agency Name
California Department of Water Resources
Contact Types
Lead/Public Agency

Location

Cities
Firebaugh, Fresno
Counties
Fresno, Madera, Merced
Cross Streets
San Mateo Rd, Dam MacNamara Rd, SR 99, 41, 152, 165
Total Acres
72,581
State Highways
33,99,41,145,152,165
Railways
SPRR
Airports
Sierra SkyPark,Mendota,Firebaugh
Schools
14
Waterways
San Joaquin River and Eastside Bypass

Notice of Determination

Approving Agency
DWR
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print