Alvarado Trunk Sewer Upgrade Project

5 Documents in Project

Summary

SCH Number
2009061013
Lead Agency
City of La Mesa
Document Title
Alvarado Trunk Sewer Upgrade Project
Document Type
NOD - Notice of Determination
Received
Posted
10/3/2011
Document Description
The City of La Mesa is pursuing a loan through the State Water Resources Control Board (SWRCB) State Revolving Fund (SRF) Loan Program to fund the replacement and partial realignment of a 2,365 to 2,445 foot segment of the City's existing sewer trunk main located adjacent to the Alvarado Creek channel. The purpose of the project is to reduce infiltration and inflow of storm water into the existing sewer trunk main. Inflow occurs from runoff entering the sewer system via manholes, and infiltration occurs for water entering cracks and breaks in the existing sewer pipeline. Additionally, the project would upgrade the capacity of the pipelines consistent with the City's Sewer Master Plan, which identifies these pipeline segments as being under capacity and requiring upsizing to handle existing and future flows.

Contact Information

Name
Chris Jacobs
Agency Name
City of La Mesa
Contact Types
Lead/Public Agency

Location

Cities
La Mesa
Counties
San Diego
Cross Streets
North of Alvarado Creek, west of Amaya Drive, south of Fletcher Pkwy, east of Bus Court
Zip
91942
Total Acres
.53
State Highways
I-8, SR 125
Railways
MTS
Airports
Gillespie Field
Schools
Parkway MS
Waterways
Alvarado Creek
Township
16S
Range
1W
Section
17/8

Notice of Determination

Approving Agency
City of La Mesa
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print