Barstow Bear Valley Reservoirs - New Bear Valley Reservoirs and Demolition of Existing Reservoirs

2 Documents in Project

Summary

SCH Number
2009061010
Lead Agency
California Department of Public Health (CDPH)
Document Title
Barstow Bear Valley Reservoirs - New Bear Valley Reservoirs and Demolition of Existing Reservoirs
Document Type
NOD - Notice of Determination
Received
Posted
7/15/2009
Present Land Use
RS-6 (Single Family Residential with a 6,000 sf minimum lot size)
Document Description
Golden State Water Company (GSWC) proposes to install 2 new welded-steel reservoirs, with foundations, on an existing GSWC reservoirs site to provide drinking water storage for the Barstow system. The smaller of the 2 proposed reservoirs will have a capacity of 0.75 MG with a height of 24 ft and a diameter of 76 ft (replacing a recently [December 2007] demolished 1.0 MG reservoir). The larger reservoir will have a capacity of 1.0 MG with a height of 24 ft. and a diameter of 88 ft. (replacing existing reservoir). The new reservoirs will be located in the same location as the existing and previously demolished reservoirs on the existing Bear Valley Reservoir site.

Contact Information

Name
Sean McCarthy
Agency Name
California Department of Public Health
Contact Types
Lead/Public Agency

Location

Cities
Barstow
Counties
San Bernardino
Cross Streets
Highway 247/East Mountain View Street
Zip
92311
Total Acres
0.92
Parcel #
0180-201-11-0000
State Highways
247
Township
9N
Range
1W
Section
6
Base
SBB&M

Notice of Determination

Approving Agency
California Department of Public Health
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print