Former North Fork Mill Site, Brownfields Cleanup Project Removal Action Workplan

Summary

SCH Number
2009058111
Public Agency
California Department of Toxic Substances Control (DTSC)
Document Title
Former North Fork Mill Site, Brownfields Cleanup Project Removal Action Workplan
Document Type
NOE - Notice of Exemption
Received
Posted
6/21/2009
Document Description
The goal of the Brownfields Cleanup Project is to remediate certain areas of the former North Fork Mill site. Specifically the goal is to remediate an area known as the former dip tank area and to remediate a waste pile known as waste pile #2. Surface soil in the former dip tank was found to contain dioxin at concentrations up to 10,500 ng/kg. The average concentration of dioxin in stockpile #2 was found to be 70.2 nanograms per kilogram (ng/kg). The Removal Action Workplan (RAW) indicates that soil from the dip tank area that contain dioxin and pentachlorophenol (PCP) above human health screening levels will be excavated and disposed of at offsite locations. Waste pile #2 will also be removed. The removal action is necessary to remove the health risk posed by dioxins and PCP.

Contact Information

Name
Thomas Kovac
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Counties
Madera
Other Location Info
unincorporated

Notice of Exemption

Exempt Status
Other
Type, Section or Code
15061(b)(3)
Reasons for Exemption
The site is on the Hazardous Waste and Substance Sites List. The project will serve to restore the Site an to reduce the environmental and human health risk impact caused by the Site conditions by the removal and offsite disposal of contaminated soil.