Capay Dam Apron Replacement Project

6 Documents in Project

Summary

SCH Number
2009052047
Lead Agency
Yolo County Flood Control and Water Conservation District
Document Title
Capay Dam Apron Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
4/8/2010

Document Description
The District is proposing to modify the dam apron on the Capay Diversion Dam by extending it 38 ft and resurfacing the concrete apron downstream from the toe of the dam and along the entire 450 ft length of the structure. The proposed project also includes installation of a grade control structure ~150 ft downstream of the dam. These project features would be designed to protect the dam from the potential advance of downstream erosion and potential dam failure and the long-term streambed degradation of Cache Creek. The proposed project would not result in an increase in diversion capacity, water delivery, or transmission.

Contact Information
Stefan Lorenzato
Yolo County Flood Control & Water Conservation District
34274 State Highway 16
Woodland, CA 95695-9371

Phone : (530) 662-0265

Location

Coordinates
38°42'48"N 122°5'4"W
Counties
Yolo
Cross Streets
State Hwy 16
Zip
95607
Total Acres
5
State Highways
16
Waterways
Cache Creek
Township
10N
Range
2W
Section
16
Base
MDB&M
Other Location Info
City/Nearest Community: Capay

Notice of Determination

Approving Agency
Yolo County Flood Control & Water Conservation District
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Yolo County Flood Control & Water Conservation District 34274 State Highway 16 Woodland, CA 95695-9371

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print