Capay Dam Apron Replacement Project

6 Documents in Project

Summary

SCH Number
2009052047
Lead Agency
Yolo County Flood Control and Water Conservation District
Document Title
Capay Dam Apron Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
10/6/2009
Document Description
This project will modify the spillway apron on the Capay Diversion Dam by replacing a portion and extending the concrete apron by ~44 ft downstream (for a total width of 55 ft) along the entire 450 ft length of the structure. The apron will be 3 ft thick. Additionally, this project will install a concrete grade control structure ~150 ft downstream of the dam designed to protect the dam from the potential advance of downstream erosion and the long-term streambed degredation of Cache Creek. Approximately 3,200 cy of material will be excavated and 9,127 cy of native and imported fill would be placed within the stream zone. This project will permanently impact ~0.03 acres and temporarily impact 0.31 acres of riparian habitat occuring along the creekbanks.

Contact Information

Name
Kelley Barker
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Yolo
Cross Streets
State Hwy 16
Zip
95607
Total Acres
5
State Highways
16
Waterways
Cache Creek
Township
10N
Range
2W
Section
16
Base
MDB&M
Other Location Info
City/Nearest Community: Capay

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print