State Route 99/Elverta Road Interchange Project (California Endangered Species Act Inciddental Take Permit No. 2081-2012-002 (ITP))
5 Documents in Project
Summary
SCH Number
2009052019
Lead Agency
Sacramento County
Document Title
State Route 99/Elverta Road Interchange Project (California Endangered Species Act Inciddental Take Permit No. 2081-2012-002 (ITP))
Document Type
NOD - Notice of Determination
Received
Posted
7/10/2012
Present Land Use
roadway / agriculture
Document Description
The County of Sacramento (Applicant) proposes to upgrade and construct and interchange at the State Route 99 / Elverta Road Intersection. The State Route 99 / Elverta Road Intersection; widen Elverta Road to four through lanes within the State access control limits (Elverta is currently a two lane road); realign the existing southbound lanes of SR 99 to fit under the over-crossing; construct a 6-foot side sidewalk on the north and south sides of Elverta road; realign the existing drainage/irrigation canals just outside the proposed State right of way limits; install underground and overhead power lines; and acquire approximately 41 acres for road right of way.
Contact Information
Name
Todd Gardner
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Sacramento
Counties
Sacramento
Cross Streets
Elverta and SR 99
Zip
95836
Total Acres
109
State Highways
99
Waterways
E Drainage Canal
Township
10N
Range
4E
Base
MDB&M
Other Location Info
Nearest Community: Natomas
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.