SR 99/ Elverta Road Sacramento County

5 Documents in Project

Summary

SCH Number
2009052019
Lead Agency
Sacramento County
Document Title
SR 99/ Elverta Road Sacramento County
Document Type
NOD - Notice of Determination
Received
Posted
12/9/2010
Present Land Use
roadway / agriculture
Document Description
The proposed project will: Construct a partial cloverleaf interchange at the SR 99/Elverta Road intersection, to replace the current at-grade signalized intersection; Widen Elverta Road to four through lanes within the State access control limits (Elverta Road is currently a two lane roadway); Caltrans and Sacramento County standards will be incorporated into the project improvements alone Elverta Road; Realign the existing southbound lanes of SR 99 to fit under the overcrossing; Construct a 6 ft wide sidewalk on the north and south sides of Elverta Road; Realign the existing drainage/irrigation ditches just outside the proposed State right-of-way limits, adjacent to the diagonal on- and off-ramps; Install underground and overhead power lines; and Acquire ~ 41 acres for road right-of-way.

Contact Information

Name
Gary L. Hobgood
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
Elverta and SR 99
Zip
95836
Total Acres
109
State Highways
99
Waterways
E Drainage Canal
Township
10N
Range
4E
Base
MDB&M
Other Location Info
Nearest Community: Natomas

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print