Document Title
Crestline - Lake Arrowhead Water Agency Great View Drive Reservoir Project
Document Type
NOD - Notice of Determination
Received
Posted
7/7/2009
Present Land Use
GP: RS-1
Document Description
The proposed project consists of (1) demolition and removal of an existing old 0.035 MG water tank; (2) construction of a new 0.22 MG welded steel water reservoir at the location of the older tank; (3) minor site preparation consisting of grading, asphalt/concrete paving, and drainage facilities; (4) piping connections; (5) a driveway from Great View Drive to the water tanks; (6) masonry block retaining wall along th entire southerly boundary and along portions of the east and west boundaries of the tank pad; (7)seismic retrofitting of the existing 0.20 MG tank; and (8) installation of a permiter chain link fence.

Contact Information

Name
Roxanne M. Holmes
Agency Name
Crestline Lake Arrowhead Water Agency
Contact Types
Lead/Public Agency

Location

Counties
San Bernardino
Cross Streets
Great View Drive
Zip
92325
Total Acres
0.33
Parcel #
0340-351-26
State Highways
18, 138
Railways
No
Airports
No
Schools
Lake Gregory ES
Waterways
Lake Gregory
Township
2N
Range
4W
Section
26
Base
SBB&M
Other Location Info
City/Nearest Community: Crestline

Notice of Determination

Approving Agency
Crestline-Lake Arrowhead Water Agency
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No