Oceanside Municipal Airport Land Use Compatibility Plan (ALUCP)

3 Documents in Project

Summary

SCH Number
2009051031
Lead Agency
San Diego County Regional Airport Authority
Document Title
Oceanside Municipal Airport Land Use Compatibility Plan (ALUCP)
Document Type
NOD - Notice of Determination
Received
Posted
12/24/2010

Document Description
The project amended certain provisions of the ALUCP adopted for the Airport in January 2010. The ALUCP provides land use compatibility policies and criteria for the area surrounding the Airport. The ALUCP promotes compatibility between the Airport and new land uses surrounding the Airport and, as such, the ALUCP includes limitations and conditions on new development surrounding the Airport. The amendments to the ALUCP include modifications to existing policies regarding safety, non-conforming structures, calculating maximum use of a site, new uses in existing structures, ALUC review for consistent projects, and threshold of change for ALUC review.

Contact Information
Angela Shafer-Payne
San Diego County Regional Airport Authority
3225 North Harbor Drive, 3rd Floor
San Diego, CA 92101-1045

Phone : (619) 400-2455

Location

Coordinates
33°13'05"N 117°21'05"W
Cities
Oceanside
Counties
San Diego
Cross Streets
Airport Rd and Benet Rd
Zip
92054
Total Acres
43
State Highways
76

Notice of Determination

Approving Agency
San Diego County Regional Airport Authority, acting as ALUC
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
3225 North Harbor Drive, 3rd Floor San Diego, CA 92101-1045

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print