Water Augmentation Project

3 Documents in Project

Summary

SCH Number
2009051006
Lead Agency
James Irrigation District
Document Title
Water Augmentation Project
Document Type
NOD - Notice of Determination
Received
Posted
10/5/2012
Present Land Use
Agriculture / open space; exclusive agriculture - minimum 20 acres
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game code to the Project applicant, Mr. John Mallyon. The Project involves the construction of town (2) 60-inch diameter siphoned pipelines to cross underneath the Fresno Slough Bypass Main Channel, between Basin 2 and the James Main Canal, the placement of fill for a water control structure across the auxiliary channel, and the placement of fill within three (3) cross-channels that receive backwater from the Main Bypass Channel. The construction activity in Fresno Slough Bypass Channel will include trenching, installation of concrete pipe, embankment fill, and restoring the channel back to its original condition.

Contact Information

Name
Sarah Paulson
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
San Joaquin
Counties
Fresno
Cross Streets
Floral & Graham Rds to Manning Avenue
Zip
93660
Total Acres
250 +/-
Parcel #
030-012-016, -011-036
State Highways
145
Railways
San Joaquin Valley
Waterways
Fresno Slough Bypass, Fish Slough
Township
15S
Range
17E
Base
MDB&M

Notice of Determination

Approving Agency
CDFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print