Pit 4 & 5A Spoil Piles
Summary
SCH Number
2009048216
Public Agency
Regional Water Quality Control Board, Region 5 (Central Valley), Redding
Document Title
Pit 4 & 5A Spoil Piles
Document Type
NOE - Notice of Exemption
Received
Posted
4/17/2009
Document Description
The Pit 4 Dam spoil pile project is intended to improve slope stability, reduce slope erosion, and minimize scour during high river flow conditions. Erosion control measures include grading, drainage enhancement, re-vegetation and boulder riprap. The project also includes improvements to the existing service road, and a scenic overlook. Several depression-type water bars will be constructed along the gravel road in order to divert drainage from the road to adjacent ditches.
The Pit 5A spoil pile work will improve slope stability, minimize erosion potential, and protect against scouring and undercutting from Miners Creek.
Contact Information
Name
Guy F. Chetelat
Agency Name
Regional Water Quality Control Board, Region 5 (Redding Branch)
Contact Types
Lead/Public Agency
Phone
Location
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15301 - Class 1
Reasons for Exemption
Existing facilities.