Shake Fiddletown Vegetation Management Project
2 Documents in Project
Summary
SCH Number
2009042135
Lead Agency
California Department of Forestry and Fire Protection
(CAL FIRE)
Document Title
Shake Fiddletown Vegetation Management Project
Document Type
NOD - Notice of Determination
Received
Posted
6/4/2009
Document Description
This project will be the establishment and maintenance of Shaded fuel breaks that are a part of the Community Fuel Break System in northern Amador County. The project will consist of fuels reduction projects that will utilize fire crew brush cutting, pile burning, and broadcast prescribed fire. The fuels treatment mechanism that is most favored is broadcast prescribed fire. The desired width of the shaded fuel break is 500 ft however the width will be increased to as much as 1,400 ft if the topography remains under 30%. The project is located along Shakeridge and extends to the north slopes leading to the Cosumnes River. Activities will be concentrated on the main ridge and the spur ridges leading to the north, proposed activities (brush cutting and prescribed fire) will not be initiated in permanent or intermittent watercourses. Archaeological resources identified during the Archaeological Survey needing protection will be avoided. To avoid impacts to nesting birds, areas to be burned during the April 1st through August 1st nesting season shall be surveyed by the VMP coordinator prior to project initiation. If nesting raptors are found within the burn area, burning shall be suspended within 1/2 mile of the nest site until after August 1st.
Contact Information
Name
Patrick McDaniel
Agency Name
Cal Fire
Contact Types
Lead/Public Agency
Phone
Location
Counties
Amador
Cross Streets
Shake Ridge Rd and Fiddletown Rd
Zip
95666
Total Acres
750
Waterways
Cosumnes River
Township
8N
Range
12E
Section
33-36
Base
MDB&M
Other Location Info
City/Nearest Community: Fiddletown
Other Information
Township: 8N
Range: 13E
Section: 31-33
Base: MDB&M
Notice of Determination
Approving Agency
Department of Forestry and Fire Protection
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes