Enclave at Granite Bay, The (PSUB T20080329)

7 Documents in Project

Summary

SCH Number
2009042133
Lead Agency
Auburn, City of (City of Auburn)
Document Title
Enclave at Granite Bay, The (PSUB T20080329)
Document Type
NOD - Notice of Determination
Received
Posted
4/7/2014
Present Land Use
Undeveloped / Residential Agricultural, Combining Minimum Building Site of 100,000 sf / Rural Residential

Document Description
The California Department of Fish and Wildlife is executing Lake or Streambed Alteration Agreement Number 1600-2013-0198-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, Granite Bay Development. The project is limited to extension of an existing culvert located in an intermittent drainage channel that crosses through the northeast corner of the project site. Extension of the culvert is necessary to accommodate an emergency vehicle access road that will be constructed at the eastern boundary of lot 1 to provide gated-access for emergency vehicles from the cul-de-sac to be constructed off to Pastor Lane to Sky View Lane.

Contact Information
Patrick Moeszinger
Department of Fish and Wildlife
North Central Region 1701 Nimbus Road, Suite A
Rancho Cordova, CA 95670

Phone : (916) 358-2850

Location

Coordinates
38°43'53.8"N 121°12'13.2"W
Counties
Placer
Cross Streets
Elmhurst Drive / Swan Lake Drive
Zip
95746
Total Acres
12.07
Parcel #
050-020-009 thru 011; 466-080-01
Schools
Eureka SD
Waterways
Folsom Lake
Township
10N
Range
7E
Section
10
Base
MDB&M
Other Location Info
City/Nearest Community: Granite Bay

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
3091 County Center Drive, Suite 190, Auburn CA 95603

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search