T-Mobile Cellular Monopole, Hebrew Christian Church

2 Documents in Project

Summary

SCH Number
2009042092
Lead Agency
City of Eureka
Document Title
T-Mobile Cellular Monopole, Hebrew Christian Church
Document Type
NOD - Notice of Determination
Received
Posted
6/17/2009
Document Description
The project is composed of the construction of a 50 ft high, 16 inch diameter painted steel T-Mobile cellular monopole with cellular cabinets in back of the existing Hebrew Christian Church, within a 200 sf area of property on a developed 66.5ft x 56 ft parcel in the central area of the City of Eureka. The cellular pole would be a monopole design with 3 concealed antennas within a plastic enclosure cover (radome) without top lighting. The foundation for the monopole would be ~7 ft square and 7 to 8 ft in depth located at the back of the building within the existing lawn and sidewalk area. The total number of cubic yards of soil to be removed from the site is 12 yards. The remainder of the existing lawn and sidewalk would remain. The Applicant in submitting for a building permit would be required to furnish a soils report, structural drawings for the foundation and pole certified by a California Licensed Structural Engineer.

Contact Information

Name
Sidnie Olson
Agency Name
City of Eureka
Contact Types
Lead/Public Agency

Location

Cities
Eureka
Counties
Humboldt
Cross Streets
Wood Street
Zip
95501
Total Acres
200 sf
Parcel #
011-063-07
Waterways
No

Notice of Determination

Approving Agency
City of Eureka
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print