Auburn Tunnel Outlet Modification Project

3 Documents in Project

Summary

SCH Number
2009042078
Lead Agency
Placer County Water Agency
Document Title
Auburn Tunnel Outlet Modification Project
Document Type
NOD - Notice of Determination
Received

Document Description
The California Department of Fish and Game is executing Lake or Streambed Alteration Agreement number 1600-2010-0076-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, Placer County Water Agency. The project is limited to infilling of an existing off-channel pond of less than 0.1 acres at the outfall of the Auburn Tunnel. This will allow for construction of a series of concrete vaults to allow access to the tunnel for purposes of sediment removal and structure inspection, installation of a flow control valve and installation of a metering system. A concrete headwall and outfall wings and a flow dissipater will be constructer at the exit from the vault structure where water enters the Auburn Ravine.

Contact Information
Robert C. Hosea
Department of Fish and Game
Sacramento Valley and Sierra Region 1701 Nimbus Rd, Suite A
Sacramento, CA 95670

(916) 704-9156

Location

Coordinates
38°53'29"N 121°7'18"W
Counties
Placer
Cross Streets
Sunset Land and Lozanos Rd
Zip
95603
Total Acres
.25
Parcel #
040-040-035
State Highways
I-80
Railways
UPRR
Waterways
Auburn Ravine
Township
12N
Range
8E
Section
18
Base
MDB&M
Other Location Info
City/Nearest Community: Ophir

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
Placer County Water Agency Business Center 144 Ferguson Rd Auburn, CA 95603

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No