Auburn Tunnel Outlet Modification Project

3 Documents in Project

Summary

SCH Number
2009042078
Lead Agency
Placer County Water Agency
Document Title
Auburn Tunnel Outlet Modification Project
Document Type
NOD - Notice of Determination
Received
Posted
12/16/2010
Present Land Use
Water Agency Facilities / Residential Ag. / High or Medium Density Residential
Document Description
The California Department of Fish and Game is executing Lake or Streambed Alteration Agreement number 1600-2010-0076-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, Placer County Water Agency. The project is limited to infilling of an existing off-channel pond of less than 0.1 acres at the outfall of the Auburn Tunnel. This will allow for construction of a series of concrete vaults to allow access to the tunnel for purposes of sediment removal and structure inspection, installation of a flow control valve and installation of a metering system. A concrete headwall and outfall wings and a flow dissipater will be constructer at the exit from the vault structure where water enters the Auburn Ravine.

Contact Information

Name
Robert C. Hosea
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Placer
Cross Streets
Sunset Land and Lozanos Rd
Zip
95603
Total Acres
.25
Parcel #
040-040-035
State Highways
I-80
Railways
UPRR
Waterways
Auburn Ravine
Township
12N
Range
8E
Section
18
Base
MDB&M
Other Location Info
City/Nearest Community: Ophir

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print