Tisdale Boat Launch Facility Improvements Project SAA 1600-2011-0052-R2
2 Documents in Project
Summary
SCH Number
2009042040
Lead Agency
Sutter County
Document Title
Tisdale Boat Launch Facility Improvements Project SAA 1600-2011-0052-R2
Document Type
NOD - Notice of Determination
Received
Posted
5/21/2012
Document Description
The project involves establishing three 8 ft wide by 20 ft long floating dock adjacent to an existing boat ramp. The docks will self adjust to the river level by a steel cable guide system. The guide system is proposed to be anchored in the Sacramento River by a 4,000 pound concrete anchor. During times of high river flows when the Tisdale Bypass is flowing, the floating docks will be removed from the river by the County Public Works Department. Separately, it is proposed that the eastern and northern sides of the existing parking lot be bound by ~1,000 ft of 6 inch high by 6 inch wide concrete curbing.
Contact Information
Name
Amy Kennedy
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Sutter
Cross Streets
Garmire Rd
Zip
95957
Total Acres
0.01
Parcel #
21-100-008, 009; 21-110-002
State Highways
20
Schools
Winship
Waterways
Sacramento River
Township
14N
Range
1E
Section
35
Base
MDB&M
Other Location Info
City/Nearest Community: Robbins
Notice of Determination
Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.