Construction of the Britton Powerhouse and Pit 3, Pit 4, and Pit 5 Dam Instream Flow Release Facilities
3 Documents in Project
Summary
SCH Number
2009042023
Lead Agency
State Water Resources Control Board
Document Title
Construction of the Britton Powerhouse and Pit 3, Pit 4, and Pit 5 Dam Instream Flow Release Facilities
Document Type
NOD - Notice of Determination
Received
Posted
5/21/2009
Document Description
PG&E has applied to the Federal Energy Regulatory Commission (FERC) to amend the license for the Pit 3, 4, and Pit 5 Hydroelectric Project to add the Britton Powerhouse at the Pit 3 Dam. PG&E had also applied to the U.S. Army Corps of Engineers for Nationwide Permits (NWPs) for the Britton Powerhouse and for construction of Instream Flow Release Structures at the Pit 3, 4 and Pit 5 Dams. Before FERC can amend the license for the Projects, and before the ACOE can issue NWPs, PG&E must obtain water quality certification under section 401 of the Clean Water Act from the State Water Resources Control Board.
Contact Information
Name
Russ Kanz
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency
Phone
Location
Counties
Shasta
Cross Streets
Clark Creek Road
Waterways
Pit River
Other Location Info
City/Nearest Community: Pit River
Notice of Determination
Approving Agency
State Water Resources Control Board
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.