Leon and Benton Roads Recycled Water System
5 Documents in Project
Summary
SCH Number
2009041119
Lead Agency
Eastern Municipal Water District
(EMWD)
Document Title
Leon and Benton Roads Recycled Water System
Document Type
NOD - Notice of Determination
Received
Posted
4/26/2011
Present Land Use
IP/IP, Storage Tank R-A-5/Rural Residential
Document Description
EMWD plans to construct a 7,000 gallon per minute (gpm) recycled water booster station on a portion of Assessor's Parcel No. 480-170-001 in an unincorporated area of Riverside County adjacent to Leon Road near the end of Driftwood Street. EMWD also proposes to construct a 4 million gallon (mg) recycled water storage tank adjacent to EMWD's existing Dutch Village 2.0 mg potable water storage tanks on Assessor's Parcel No. 963-010-008 near the intersection of Benton and Pourroy Roads. In addition, EMWD plans to construct a 24-inch diameter recycled water pipeline to connect the new tank to existing 24-inch diameter recycled water line in Winchester Road at its intersection with Benton Road.
Contact Information
Name
Karen Hackett
Agency Name
Eastern Municipal Water District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Murrieta, Temecula
Counties
Riverside
Cross Streets
Leon Road, Benton Road, Pourroy Road, and Winchester Road
Zip
92596
Parcel #
480-170-001 and 963-010-008
State Highways
79
Airports
French Valley
Schools
Temecula Prep.
Township
6/7S
Range
2W
Section
32/5
Base
SBB&M
Notice of Determination
Approving Agency
EMWD
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.