Warren E&P Inc. WTU Central Facility New Equipment Project

3 Documents in Project

Summary

SCH Number
2009041083
Lead Agency
South Coast Air Quality Management District
Document Title
Warren E&P Inc. WTU Central Facility New Equipment Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
WTU Central Facility is planned M2-1 VL-O (Light Industrial Zone) and RD3-1XL-O (Restricted Multiple Dwelling Zone), with some parcels sharing the two designations. The "O" at the end of each designation indicates that the parcels are located in an Oil Drilling District and that such activities are permitted in the zone.
Document Description
NOTE: Subsequent Operators of the Warren E&P WTU Central Facility are proposing modifications to a project analyzed and approved in a 2006 MND. The currently proposed project consists of removing the existing permitted Flare King flare, refurbish Heater-Treater No. 1 (HT#1), removing a previously operated water heater, and replacing or upgrading these pieces of equipment with the most efficient equipment available, including: an ultra-low NOx burner equipped Heater-Treater No. 2 (HT#2) to meet oil-water separation needs, nine Ingersoll-Rand MT-70 microturbines to generate electrical power for use on site, and an ultra-low NOx Bekaert Clean Enclosed Burner (Bekaert CEB) to combust any remaining natural gas. (Bekaert CEB) to combust any remaining natural gas. The proposed project also includes a monthly average daily cap for oil production of 5,000 barrels per day.

Contact Information

Name
Steve Smith
Agency Name
South Coast Air Quality Management District
Contact Types
Lead/Public Agency

Location

Cities
Carson
Counties
Los Angeles
Cross Streets
Anaheim St and Eubank Ave and Banning Blvd and Opp St
Zip
90744
Total Acres
2
State Highways
I-110, 710
Schools
Holy Family, Fries Ave ES, Wilmington MS, Wilmington Park ES,Pac
Waterways
Dominguez Channel and Port of Long Beach
Other Location Info
City/Nearest Community: Wilmington & Carson
Other Information
schools cont.: Pacific Harbor Christian, Catskill Ave ES

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
Air Resources Board, Major Industrial Projects, California Department of Conservation (DOC), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 7 (DOT), California Energy Commission, California Highway Patrol, California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), Department of Toxic Substances Control, Department of Water Resources, Office of Emergency Services, California, Resources Agency
Development Types
Industrial (Acres 10, Employees 16)
Local Actions
Use Permit
Project Issues
Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Solid Waste, Transportation

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print