San Marcos Elementary School Reconstruction

2 Documents in Project

Summary

SCH Number
2009041039
Lead Agency
San Marcos Unified School District
Document Title
San Marcos Elementary School Reconstruction
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
PLU: Elementary scool Z: R-3(6) GP; School
Document Description
The SMUSD proposes to reconstruct, expand, and reconfigure San Marcos Elementary School. The project would require the demolition of the existing school, including buildings, parking lots, and playground/playfield areas. The school would be reconstructed to accommodate 850 students, an increase of 200 students seats. The new school would include 77,000 sf new building space, including 2 two-story building. The project also proposes to reconfigure the school site boundaries as a result of a land exchange agreement between SMUSD and the City of San Marcos. This project is expected to be completed by the fall of 2010. Both the Foothills High School South Campus and San Marcos Museum would be relocated off-site to improved locations and to make room for teh new San Marcos Elementary School.

Contact Information

Name
Katherine Tanner
Agency Name
San Marcos Unified School District
Contact Types
Lead/Public Agency

Location

Cities
San Marcos
Counties
San Diego
Cross Streets
San Marcos Blvd & Lowry Ln
Zip
92069
Total Acres
12.85
Parcel #
220-150-11, 15, 21, 24, 26
State Highways
SR 78
Railways
NCTD
Waterways
San Marcos Creek

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Conservation (DOC), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 11 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Diego Region 9 (RWQCB), Department of Toxic Substances Control, Department of Water Resources, Office of Historic Preservation, Resources Agency, Resources, Recycling and Recovery
Development Types
Educational (school reconsruction: 77,000 sf)
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, CCR Title 5

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print