Rancho Paseo de Valencia Project (Streambed Alteration Agreement No. 1600-2013-0134-R6)

3 Documents in Project

Summary

SCH Number
2009041015
Lead Agency
Corona, City of (City of Corona)
Document Title
Rancho Paseo de Valencia Project (Streambed Alteration Agreement No. 1600-2013-0134-R6)
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW has executed Streambed Alteration Agreement No. 1600-2013-0134-R6, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Rancho Paseo de Valencia. The project is limited to the development of 65.4 acres for the construction of up to 34 single-family homes, landscaping, infrastructure, on-site roadways, residential streetlighting, two (2) water quality basins, six open space areas, and recreational areas. The Project includes filling the entirety of Drainages A, B, D, E, and F, and constructing storm drains and energy dissipation structures. Interceptor drains, down drains, and storm drains will be constructed to capture and deliver runoff to a water quality detention basin. Rip-rap and/or energy dissipaters will be constructed at the storm drain outlet to reduce the flow velocities to non-erosive levels.

Contact Information
Joanna Gibson
CDFW
3602 Inland Empire Blvd., Suite C-220
Ontario, CA 91764

909-987-7449

Location

Coordinates
33°49'52"N 117°35'7"W
Cities
Corona
Counties
Riverside
Cross Streets
At southerly terminus of Malaga Street
Zip
92882
Total Acres
65.4
Parcel #
114-040-019, 114-040-020, 275-100-003
State Highways
No
Railways
Metrolink
Airports
Corona Municipal
Schools
Corona-Norco Unified District
Waterways
No
Township
4S
Range
7W
Section
10, 11
Base
SBB&M
Other Information
Continue Section: and 14

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
3602 Inland Empire Blvd., Suite C-220, Ontario, CA 91764

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search