Fish Barrier Dam - Buoy Line Installation Project

Summary

SCH Number
2009038193
Public Agency
California Department of Water Resources (DWR)
Document Title
Fish Barrier Dam - Buoy Line Installation Project
Document Type
NOE - Notice of Exemption
Received
Posted
3/18/2009
Document Description
DWR is proposing to install a safety buoy line across the Feather River immediately downstream of the Fish Barrier Dam. This project is in response to a Federal Energy Regulatory Commission (FERC) inspection of the Oroville Project Facilities during June of 2008. FERC concluded that a safety barrier was necessary to prevent access to the base of the Fish Barrier Dam spillway. This project will entail the installation of permanent anchors to be cemented to the bedrock on both sides of the Feather River, to support a cable approximately 175 feet long that will span the river and be floated with buoys.

Contact Information

Name
Stacy Cepello/Eric See
Agency Name
California Department of Water Resources
Contact Types
Lead/Public Agency

Location

Cities
Oroville
Counties
Butte

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15304 - Class 4
Reasons for Exemption
This project will consist of minor alteration to the streambank that will not involve the egetation, or change the condition of the water.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print