Walnut Canyon Reservoir Drainage Improvement Project

Summary

SCH Number
2009038133
Lead Agency
Anaheim, City of (City of Anaheim)
Document Title
Walnut Canyon Reservoir Drainage Improvement Project
Document Type
NOE - Notice of Exemption
Received
Posted
3/13/2009

Document Description
The project will repair an existing impaired drainage system within a MWD easement adjacent to Walnut Canyon Reservoir. Project construction includes clearing of associated vegetation, installation of rip-rap and construction of a v-ditch across the road and then will ultimately tie into the City's stormdrain system. Activities include dredging and spoil removal of sediment/drainage that has accumulated as a result of the impairment. All sediment will be transported offsite.

Contact Information
Marie Newland
City of Anaheim
200 S. Anaheim Boulevard
Anaheim, CA 92805

Phone : (714) 765-4166

Location

Cities
Anaheim
Counties
Orange

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15302, 15304 - Class 2, 4
Reasons for Exemption
The project consists of the repair of an existing drainage system to allow unimpeded drainage across a MWD easement.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print