Natomas Levee Improvement Program, Phase 4a Landside Improvements Project

31 Documents in Project

Summary

SCH Number
2009032097
Lead Agency
Sacramento Area Flood Control Agency
Document Title
Natomas Levee Improvement Program, Phase 4a Landside Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
10/13/2011
Document Description
CDFG is executing Lake or Streambed Alteration Agreement number 1600-2011-0147-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, Sacramento Area Flood Control Agency. As part of the landside Improvements Project, SAFCA has constructed a segment of a new adjacent levee to improve flood protection along the Sacramento River adjacent to the existing Sacrament River east levee along the landside of the Garden Highway. Multiple phases, SAFCA has constructed surface drain outfalls to the Sacramento River from the confluence of the Sacrament River and Natomas Cross Canal to ~2,500 linear feet south of the North Drainage Canal along the Garden Highway. SAFCA seeks to construct these outfalls prior to November 1, 2011.

Contact Information

Name
Sandra Jacks
Agency Name
DFG North Central Region
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento, Sutter
Cross Streets
Various
State Highways
Hwy 5, 99, 80
Airports
Sacramento International
Waterways
Sacramento & American Rivers, Natomas Cross Canal, Pleasant Grove Creek Canal, Natomas East Main
Other Information
Waterways: Natomas East Main Drainage Canal

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.