Natomas Levee Improvement Program, Phase 4a Landside Improvements Project
31 Documents in Project
Summary
SCH Number
2009032097
Lead Agency
Sacramento Area Flood Control Agency
Document Title
Natomas Levee Improvement Program, Phase 4a Landside Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
4/30/2010
Document Description
The California Department of Fish and Game is executing Lake or Streambed Alteration Agreement number 1600-2010-0009-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, Sacramento Area Flood Control Agency (SAFCA).
The proposed project would involve improvements to the existing pump. In order to accommodate existing flow rates over the raised levee profile of the NCC south levee (the levee was raised and a seepage cutoff wall was installed in the levee as part of Phase 2 of the Landside Improvements Project) the existing pump motor and pump column (including the impeller) would need to be upgraded. The pump would be removed from the support structure and transported to a factory to perform the upgrades. Removal of the pump would be facilitated by a crane staged on the access road. The existing support structure is also in need of repair. The existing structure would be proposed to be dismantled and a new structure (including a new platform) would be constructed.
Contact Information
Name
Gary L. Hobgood
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Sacramento
Counties
Sacramento, Sutter
Cross Streets
Various
State Highways
Hwy 5, 99, 80
Airports
Sacramento International
Waterways
Sacramento & American Rivers, Natomas Cross Canal, Pleasant Grove Creek Canal, Natomas East Main
Other Information
Waterways: Natomas East Main Drainage Canal
Notice of Determination
Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes