Northgate High School Stadium Lighting Project

3 Documents in Project

Summary

SCH Number
2009032093
Lead Agency
Mount Diablo Unified School District
Document Title
Northgate High School Stadium Lighting Project
Document Type
NOD - Notice of Determination
Received
Posted
6/17/2010
Document Description
Mt. Diablo Unified School District is proposing numerous improvements to the football stadium. These include: stadium lighting, permanent bleachers, additional speakers and a press box. Four light poles, each containing twelve, 1500 watt halide lamps, are proposed. Preliminary plans call for the poles to be 80 ft tall and mounted on a 2 ft high concrete base. They would be made of galvanized steel and the 12 lamps made of anodized aluminum. The lamps would be equipped with glare control louvers and shields with a black finish. In addition to stadium lights, the District is also planning on replacing the existing temporary bleachers and installing permanent bleachers that will seat up to 1,500 persons. The bleachers would be located on the east and west side of the field. The "home" side bleachers, located on the east side of the field, would seat 1,000 persons and the visiting side bleachers, located on the west side, would seat 500 persons. Improvements also include upgrading the public address system by adding 2 additional speakers for a total of 4. The speakers would be located on each of the light poles to create a distributed sound system.

Contact Information

Name
Pete Pedersen
Agency Name
Mount Diablo Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Walnut Creek
Counties
Contra Costa

Notice of Determination

Approving Agency
Mt. Diablo Unified School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print