San Joaquin Flood Protection Project, Five Critical Erosion Sites, San Joaquin River, RM 41.4L,42.1R,42.5R
5 Documents in Project
Summary
SCH Number
2009032088
Lead Agency
California Department of Water Resources
(DWR)
Document Title
San Joaquin Flood Protection Project, Five Critical Erosion Sites, San Joaquin River, RM 41.4L,42.1R,42.5R
Document Type
NOD - Notice of Determination
Received
Posted
6/19/2009
Document Description
DWR is proposing to implement bank protection measures along the San Joaquin River at river mile 71.5R. The repair design would maximize slope stability while retaining the essential features of the channel with the repair ends transitioned with revetment gradually tapered to match the existing bankline. The project will incorporate a riparian bench in its design. Project will include clean quarry stone riprap below the mean water surface elevation (tidal or August mean) and rock above these levels with agricultural soil placed within voids and covered with a layer of soil. The repairs will protect-in-place larger vegetation and incorporate where possible on-site mitigation for vegetation or wildlife impacts. No excavation would occur in the channel and construction would occur from landside.
Contact Information
Name
Gary. L Hobgood
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Manteca, Stockton
Counties
San Joaquin
Cross Streets
Hwy 4 & W. charter Way, S. Airport Way & Kasson Rd.
Zip
95206/952
Total Acres
6.5
Parcel #
16214001, 16302033, 163070362, 2412
State Highways
3, I-5, Hwy 99
Railways
BNSF
Airports
New Jerusalem
Schools
San Joaquin ES
Waterways
San Joaquin River, Stanislaus River
Township
1N,3S
Range
6E,7E
Other Information
Sections: 12,16,17,21,7
Notice of Determination
Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.