Cloverdale River Park - Phase 3 Improvements & FEMA Project
3 Documents in Project
Summary
SCH Number
2009032025
Lead Agency
Sonoma County
Document Title
Cloverdale River Park - Phase 3 Improvements & FEMA Project
Document Type
NOD - Notice of Determination
Received
Posted
5/11/2009
Document Description
The project includes development of Cloverdale River Park - Phase 3, which was originally described and analyzed in a 1998 Master Plan & Initial Study. The Phase 3 project consists of recreation, bank stabilization, and habitat restoration. Recreation improvements generally include construction of an ADA-accessible river access ramp and boat portage, a small, compacted gravel parking area, family picnic sites, ADA-accessible connecting pathways, and interpretive panels. The bank stabilization and habitat restoration element generally consists of removing portions of any existing eroded levee that isolates the Russian River from its floodplain; restoration of 1,200 lineal ft of eroded riverbank slope through clean fill, regarding, seeding, and planting; placement of live siltation baffles and willow-planted rock structures to protect the restored bank, collect sediment, and reform bars at the toe of the restored riverbank; bank stabilization and erosion control using coir erosion blankets, willow mattresses, willow sprigging, and cottonwood poles; planting over 500 native trees and shrubs; and implementing conventional erosion control and bank stabilization techniques such as silt fencing, straw wattles, mulching, hydroseeding, and planting.
Contact Information
Name
Michelle Julene
Agency Name
Sonoma County
Contact Types
Lead/Public Agency
Phone
Location
Cities
Cloverdale
Counties
Sonoma
Regions
Unincorporated
Cross Streets
McCray Rd
Zip
95425
Total Acres
1
Parcel #
Sec No 1
Waterways
Russian River
Township
11N
Range
10W
Section
6
Base
MDB&M
Notice of Determination
Approving Agency
Sonoma County
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.