Humboldt County Department of Public Works-Charles Bar

3 Documents in Project

Summary

SCH Number
2009032024
Lead Agency
Humboldt County
Document Title
Humboldt County Department of Public Works-Charles Bar
Document Type
NOD - Notice of Determination
Received
Posted
4/16/2009
Present Land Use
AE (Agriculture exclusive); TPZ (Timberland Production Zone) / AG (Agriculture Grazing), T (Timber Production); Framework Plan
Document Description
The mining operation was originally permitted in 1993 for the extraction and crushing of up to 25,000 cubic yards of gravel every 3 to 5 years for County road maintenance. The Humboldt County Department of public works has performed 4 extractions at the site. The volume, location and extraction method will be consistent with the recommendations of CHERT and other responsible agencies. Equipment includes a bulldozer or excavator, front-end loader, a haul truck and/or dump trucks and portable crusher. Crushed material will be stockpiled at designated permanent areas. When no crushing is done, extracted material will be transported to a job site. The bar will be accessed via the designated haul road on the bar directly off of Alderpoint Rd. Gravel extraction will be intermittent, with each extraction period lasting approximately three to four weeks.

Contact Information

Name
Anita Punla
Agency Name
Humboldt County
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Cross Streets
Alderpoint Rd
Zip
95514
Total Acres
18
Parcel #
217-153-04, -05
Waterways
Larabee Creek
Township
1S
Range
4E
Section
36
Base
HB&M
Other Location Info
City/Nearest Community: Blocksburg

Notice of Determination

Approving Agency
Humboldt County Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print