Removal Action Workplan for Metropolitan Transportation Authority (MTA)/Butterfield Site

14 Documents in Project

Summary

SCH Number
2009031083
Lead Agency
Los Angeles County
Document Title
Removal Action Workplan for Metropolitan Transportation Authority (MTA)/Butterfield Site
Document Type
NOD - Notice of Determination
Received
Posted
10/30/2015
Present Land Use
Singel family and multi-family residential, commercial, government instituational, vacant/parking.
Document Description
DTSC has approved the RAW project in accordance with Chp 6.8 of the Health and Safety Code. The project includes the following activities as listed below to remove soil and groundwater contamination from the 2.9 acre MTA/Butterfield Site: 1) soil and groundwater data gap investigation to determine the extent of the proposed cleanup; 2) shallow soil excavation within three areas (2000 cy) and offsite disposal; 3) excavation of unconsolidated soil/fill within the proposed location 61 building footprint to a max depth of 10 ft below ground surface (bgs); 4) design and implement an In Situ Chemical Oxidation (ISCO) pilot test. MTA may develop a removal action plan for full-scale implementation.

Contact Information

Name
Jessy Fierro
Agency Name
DTSC Brownfields
Contact Types
Lead/Public Agency

Location

Cities
Beverly Hills, Los Angeles, Los Angeles, City of, Beverly Hills, Santa Monica, ..., Santa Monica
Counties
Los Angeles
Cross Streets
Wilshire/Western to Wilshire/4th Street and Hollywood/Highland to Wilshire/La Clenega
Zip
90095
Total Acres
24320
Parcel #
Multiple
State Highways
I-405, I-10
Railways
Metrolink, Amtrak, UP
Schools
Multiple
Waterways
Los Angeles River
Township
1S
Range
14E
Base
SBB&M

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print