North Simi Drain Retrofit @ Union Pacific Railroad/Metrolink Crossing

2 Documents in Project

Summary

SCH Number
2009031081
Lead Agency
Ventura County Watershed Protection District
Document Title
North Simi Drain Retrofit @ Union Pacific Railroad/Metrolink Crossing
Document Type
NOD - Notice of Determination
Received
Posted
6/2/2009
Document Description
The project would modify the junction of the VCWPD North Simi Drain (concrete-lines channel) and a City of Simi Valley storm drain lateral to increase effective storm flow capacity and reduce the potential for flooding. The existing 66-inch diameter reinforced concrete pipe storm drain lateral would be extended from the manhole north of the Union Pacific Railroad/Metrolink railroad tracks, under the railroad tracks, parallel to the north Simi Drain, then intersect the North Simi Drain south of the railroad tracks. The new storm drain pipe would require relocation of a 100-foot section of a City of Simi Valley sewer line to a new alignment a few feet west of its existing location, and construction of new sewer manholes.

Contact Information

Name
Peter Sheydayi
Agency Name
Ventura County Watershed Protection District
Contact Types
Lead/Public Agency

Location

Cities
Simi Valley
Counties
Ventura
Cross Streets
First Street/Chambers Lane
Zip
93063
Total Acres
0.5
Parcel #
630-0-150-01
State Highways
SR 118
Railways
Union Pacific RR
Waterways
Arroyo Simi
Township
2N
Range
18W
Section
8
Base
SBB&M

Notice of Determination

Approving Agency
Ventura County Watershed Protection District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.