Chevron Productions Company (Administrative Plan Review Permit No. 08-100, Demolition Permit No. 08-027, Initial Study No. 08-013, Mitigated Negative Declaratio

4 Documents in Project

Summary

SCH Number
2009031004
Lead Agency
City of Malibu
Document Title
Chevron Productions Company (Administrative Plan Review Permit No. 08-100, Demolition Permit No. 08-027, Initial Study No. 08-013, Mitigated Negative Declaratio
Document Type
NOD - Notice of Determination
Received
Posted
4/7/2009
Document Description
This application consists of a request for a demolition permit to allow the removal of all existing on site structures, improvements and appurtences at an existing (non-operational) Chevron gas station located at 23614 Pacific Coast Highway in the City of Malibu. Adjacent offsite sidewalks, curbs, driveway approaches and perimeter walls would remain in place. The application also includes a request to remove 4 existing 10,000 gallon underground storage tanks and 3 hydraulic vehicle lifts.

Contact Information

Name
Joseph Smith
Agency Name
City of Malibu
Contact Types
Lead/Public Agency

Location

Cities
Malibu
Counties
Los Angeles
Cross Streets
Pacific Coast Hwy and Malibu Rd
Zip
90265
Total Acres
0.54
Parcel #
4458-019-008
State Highways
1
Schools
Colin McEwan HS, 23410 Civic Center Way
Waterways
Pacific Oceans

Notice of Determination

Approving Agency
City of Malibu
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print