Drewry Rock Quarry

2 Documents in Project

Summary

SCH Number
2009022016
Lead Agency
Humboldt County
Document Title
Drewry Rock Quarry
Document Type
NOD - Notice of Determination
Received
Posted
3/17/2009
Document Description
A modification and renewal of a Conditional Use/Surface Mining Permits, approval of Reclamation Plan and review of financial assurance cost estimates for an existing surface mining operation known as the Drewry Rock Quarry and previously known as the Bell Springs Rock Quarry. THe term is 15 years and will expire in March 10, 2023. The site has historically been mined since 1993 by the Humboldt County Dept. of Public Works for a total of 30,807 cubic yards. The original permit allowed for annual extraction of 2,000 cubic yards for a total of 30,000 cubic yards and periodic use of a portable crusher 2 weeks annually. The modification proposes an annual extraction of up to 20,000 cubic yards with the total amount of extraction not to exceed 69,200 cubic yards. Operations include extraction, crushing and stockpiling. No washing and no asphalt/cement batch processing will be conducted on site. In the event localized greywacke boulders are encountered, small scale seperation with charges may be performed. No new access roads to the quarry will be constructed. Heavy equipment to be used on site includes: an excavator, a front end loader, and a portable rock crusher. The Humboldt County Dept. of Public Works has a License Agreement with the owner for activities associated with mining, crushing and stockpiling.

Contact Information

Name
Anita Punla
Agency Name
Humboldt County Planning Division
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Cross Streets
Island Mountain and Bells Springs Rd
Zip
95542
Total Acres
2
Parcel #
216-021-07
Township
5S
Range
5E
Section
16
Base
HBM
Other Location Info
City/Nearest Community: New Harris

Notice of Determination

Approving Agency
Community Development Services
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print