Bear River North Levee Erosion Sites Repair Project

3 Documents in Project

Summary

SCH Number
2009022011
Lead Agency
Reclamation District 2103
Document Title
Bear River North Levee Erosion Sites Repair Project
Document Type
NOD - Notice of Determination
Received
Posted
8/20/2009
Document Description
The proposed project site includes two locations (Erosion Sites 1 and 2) along the Bear River, south of the Town of Wheatland. Erosion Site 1 is approximately 250 linear feet long, with an area of 0.32 acres. Erosion Site 2 is approximately 500' in length and has an area of 0.35 acres. The erosion repair at Site 1 will involve removing existing soil and redistributing it as necessary to establish the desired slope configuration of 2:5:1. Stone shall be placed systematically beginning at the base of the embankment slope which will result in a stone dike that will support the placement of the riprap. For levee toe relpacement, the rock will be lpaced using a drag or clamshell-type bucket by excavator from the levee crown. Approximately 12" of bedding material, consisting of rock fragments of less than 4" in size, will then be placed along the slope. The erosion repair at Site 2 will involve removing existing soil and redistributing it as necessary to establish the desired slope configuration of 3:1. Stone shall be placed systematically beginning at the base of the embankment slope, which will result in a stone dike that will support the placement of riprap. For levee toe replacement, the rock shall be placed using a drag or clamshell-type bucket by excavator from the crown. Approximately 12" of bedding material, consisting of rock fragments of less than 4" in size, will then be placed along the slope.

Contact Information

Name
Kelley Barker
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Wheatland
Counties
Placer, Yuba
Total Acres
0.8
State Highways
SR 65
Railways
UPRR
Schools
Wheatland High, Wheatland Elementary
Waterways
Bear River, Feather River, Dry Creek
Township
14/13N
Range
5E
Base
3/9

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print