Trancas Country Mart and HOW'S Market (Initial Study No. 07-010 and Mitigated Negative Declaration No. 07-009)

3 Documents in Project

Summary

SCH Number
2009021100
Lead Agency
City of Malibu
Document Title
Trancas Country Mart and HOW'S Market (Initial Study No. 07-010 and Mitigated Negative Declaration No. 07-009)
Document Type
NOD - Notice of Determination
Received
Posted
1/26/2010
Document Description
Coastal Development Permit No. 07-076, Minor Modification No. 09-001, Site Plan Review No. 07-073 Variance Nos. 07-041 and 09-011, Conditional Use Permit Nos. 07-009, 07-013 and 09-001, Initial Study No. 07-010 and Mitigated Negative Declaration No. 07-009- An application for the remodel and expansion of an existing shopping center (Trancas Country Mart and HOW'S Market), including a 25,728 square foot addition to the existing commercial shopping center located at 30745 Pacific Coast Highway, a new parking lot located at 30811 Pacific Coast Highway, new alternative onsite wastewater treatment systems, landscape, hardscape, and the temporary relocation of an existing karate studio into a triple-wide modular unit during construction, including a site plan review for construction in excess of 18 feet, a variance for grading in excess of 3,000 cubic yards, a variance for the reduction of a required side yard setback, a minor modification to reduce the required front yard setback by 50 percent, and three conditional use permits to allow for two restaurants and the addition of over 500 sf to an existing commercial development.

Contact Information

Name
Richard Mollica
Agency Name
City of Malibu
Contact Types
Lead/Public Agency

Location

Cities
Malibu
Counties
Los Angeles
Cross Streets
Trancas Canyon Road and Pacific Coast Highway
Zip
90265
Total Acres
18.83
Parcel #
4469-045-001 and 4470-012-001
State Highways
1
Waterways
Pacific Ocean

Notice of Determination

Approving Agency
City of Malibu
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print