Bear Valley Parkway North Widening Project

3 Documents in Project

Summary

SCH Number
2009021015
Lead Agency
San Diego County
Document Title
Bear Valley Parkway North Widening Project
Document Type
NOD - Notice of Determination
Received
Posted
8/16/2011
Present Land Use
General Plan Circulation Element Classification: (4-lane) Major Road w/Bike Lanes
Document Description
The California Department of Fish and Game is issuing an Agreement regarding the Stream Alteration to the project applicant, County of San Diego, Department of Public Work. The Project is limited to widening of Bear Valley Parkway from SR-78 to Boyle Avenue to four travel lanes in an approximately 110-foot-wide right-of-way, bicycle lanes, shoulders, parkways, turn lanes, and a center median. Portions of the center median and parkways will be landscaped. Drainage work will include new curb and gutter; curb inlets, extension or replacement of four existing reinforced concrete pipe (RCP) or reinforced concrete box (RCB) culvert systems, placement of headwalls and wingwalls, and addition of rip rap energy dissipaters at culvert outlets. The new curb inlets would be installed along the length of the widened roadway to capture surface flows along the road and from offside areas draining onto Bear Valley Parkway. The general existing pattern of drainage flow shall be maintained.

Contact Information

Name
Darren Bradford
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Escondido
Counties
San Diego
Cross Streets
Bera Valley Parkway, between Sna PAsqual Valley Road (SR 78) and Boyle Avenue
Zip
92025
Total Acres
~ 1 mi of roadwa
State Highways
78
Schools
Escondido Union Schools
Waterways
San Bernardino Valley (stream), San Diego Aqueduct
Township
12S
Range
2W
Section
unsect

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes