Interim Operations and Maintenance Plan, Levee Maintenance Component _ PG&E Shell Pond Site

Summary

SCH Number
2009018230
Public Agency
Department of Toxic Substances Control
Document Title
Interim Operations and Maintenance Plan, Levee Maintenance Component _ PG&E Shell Pond Site
Document Type
NOE - Notice of Exemption
Received
Posted
1/28/2009
Document Description
The objective of this project is to prevent inflow and outflow from the pond, thus minimizing or eliminating the possibility of violations of effluent limitations and/or inflow of tidal water containing aquatic species. These factors create an urgent need to complete this maintenance work before the heavy rains occur during the 2008-2009 rainy season. This project is an interim measure designed to ensure compliance with environmental regulations, while PGA& works with regulatory agencies and other interested stakeholders to develop engineering design plans and to obtain associated permits for a permanent remedy for the Shell Pond.

Contact Information

Name
Homayune Atiqee
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Counties
Contra Costa
Other Location Info
Unincorporated

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15330 - Class 30
Reasons for Exemption
The project is limited to bringing in less than 1,000 cubic yards of soil from sources outside of the PG&E Shell Pond Site over a period of approximately one week to allow for a consistent levee height of 9.0 feet (NAVD 88 datum).

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.