Denniston Reservoir 5-year Maintenance Program
5 Documents in Project
Summary
SCH Number
2009012083
Lead Agency
San Mateo County
Document Title
Denniston Reservoir 5-year Maintenance Program
Document Type
NOD - Notice of Determination
Received
Posted
9/24/2009
Document Description
The Coastside County Water District (CCWD) proposes to dredge ~800 cy of sediment the first year of operations and then 400 cy on an annual basis for the subsequent 4 yrs around 2 intakes located on Denniston Reservoir. Denniston Reservoir is a 31 acre ft reservoir located on Denniston Creek in San Mateo County, CA. The reservoir will be dewatered for the dredging operations and will be conducted through the drain in the pump station wet well. The discharge will flow directly to the creek at the outlet structure of the small spillway and stop logs will be removed st both spillway structures. A siphon through a 6" flex hose will be used in front of the small spillway structure which will discharge the water into the spillway structure and into Denniston Creek. The dredging will be done with an excavator with a 50 ft reach located ont he dam itself. Spoils will be trucked to a nearby disposal site 1/2 mile away from the project area. Excavation is expected to be conducted annually is September or October preceded by hand removal of vegetation.
Contact Information
Name
Suzanne DeLeon
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Half Moon Bay
Counties
San Mateo
Cross Streets
0.5 miles east of Highway 1 near Half Moon Bay Airport
Zip
94019
Total Acres
0.353 and 7.961
Parcel #
037-320-150 and 037-320-140
State Highways
1
Airports
Hal Moon Bay Airport
Waterways
Denniston Creek
Township
11S
Range
1W
Base
MDB&M
Other Location Info
Cirty/Nearest Cimmunity: El Granada
Notice of Determination
Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.