- SCH Number
- 2009012081
- Lead Agency
- Central Valley Flood Protection Board
- Document Title
- Sacramento River Bank Protection Project, Phase II Supplemental Authorization
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 8/26/2020
- Document Description
- The Sacramento River Bank Protection Project (SRBPP) is a continuing construction project authorized by Section 203 of the Flood Control Act of 1960. The purpose of this project is to provide protection to the existing levee and flood control facilities of the Sacramento River Flood Control Project. To date, work has been carried out in two phases, with a total of about 820,000 feet of river stabilized under the project. Current SRBPP work is being conducted under Phase II of its existing federal authorization. The supplemental authorization of 80,000 linear feet is in addition to the previously constructed 820,000 linear feet.
- Contact Information
-
Itzia Rivera
Central Valley Flood Protection Board
Lead/Public Agency
3310 El Camino Avenue, Suite 170
Sacramento, CA 95821
Phone : (916) 480-5388
itzia.rivera@cvflood.ca.gov
Location
- Counties
- Butte Colusa Glenn Placer Sacramento Solano Tehama Yolo Yuba
- Other Location Info
- The project is located along the levees of the Sacramento River Flood Control Project in Butte, Colusa, Glenn, Placer, Sacramento, Solano, Sutter, Tehama, Yolo, and Yuba Counties.
Notice of Determination
- Approving Agency
- Central Valley Flood Protection Board
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- The Environmental Impact Report, with comments and responses, and record of approval is available to the general public at the Board’s office located at 3310 El Camino Avenue, Suite 170, Sacramento, CA 95821.
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Notice of Determination
- Receipt PDF 61 K SRBPP_PACR-EIS-EIR_Notice of Determination_FINAL PDF 201 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.