Sacramento River Bank Protection Project, Phase II Supplemental Authorization

4 Documents in Project

Summary

SCH Number
2009012081
Lead Agency
Central Valley Flood Protection Board
Document Title
Sacramento River Bank Protection Project, Phase II Supplemental Authorization
Document Type
NOD - Notice of Determination
Received
Posted
8/26/2020

Document Description
The Sacramento River Bank Protection Project (SRBPP) is a continuing construction project authorized by Section 203 of the Flood Control Act of 1960. The purpose of this project is to provide protection to the existing levee and flood control facilities of the Sacramento River Flood Control Project. To date, work has been carried out in two phases, with a total of about 820,000 feet of river stabilized under the project. Current SRBPP work is being conducted under Phase II of its existing federal authorization. The supplemental authorization of 80,000 linear feet is in addition to the previously constructed 820,000 linear feet.

Contact Information
Itzia Rivera
Central Valley Flood Protection Board
3310 El Camino Avenue, Suite 170
Sacramento, CA 95821

Phone : (916) 480-5388
itzia.rivera@cvflood.ca.gov

Location

Counties
Butte Colusa Glenn Placer Sacramento Solano Tehama Yolo Yuba
Other Location Info
The project is located along the levees of the Sacramento River Flood Control Project in Butte, Colusa, Glenn, Placer, Sacramento, Solano, Sutter, Tehama, Yolo, and Yuba Counties.

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
The Environmental Impact Report, with comments and responses, and record of approval is available to the general public at the Board’s office located at 3310 El Camino Avenue, Suite 170, Sacramento, CA 95821.

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
Receipt   PDF 61 K SRBPP_PACR-EIS-EIR_Notice of Determination_FINAL   PDF 201 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print