Hearn Avenue Widening Phase 2

3 Documents in Project

Summary

SCH Number
2009012079
Lead Agency
City of Santa Rosa
Document Title
Hearn Avenue Widening Phase 2
Document Type
NOD - Notice of Determination
Received
Posted
6/30/2009
Document Description
The City of Santa Rosa proposes roadway improvements along an approximately 620-foot long segment of Hearn Avenue to improve circulation along the eastern Hearn Avenue corridor and to provide additional capacity for vehicle stacking at traffic signals. An approximately 150-foot long segment of Hearn Avenue would be widened. Specifically, the proposed road widening would include the following elements: 1) addition of a west travel lane along the entire project length; 2) addition of bike lanes to the east of the Colgan Creek box culvert; 3) installation of new curbs and gutters on both sides of the roadway; 4) widening of the existing box culvert by approximately 47 feet to accommodate the proposed roadway improvements; 5) upgrade of two pedestrian ramps at Whitewood Drive and the sidewalk and driveway at 637 Hearn Avenue to meet current ADA standards; 6) reconstruction of the existing railroad signal and crossing arm foundations; 7) addition of raised median islands on either side of the railroad crossing; and 8) replacement of approximately 170 feet of SMART track and other minor improvements to an additional approximately 380 feet of railroad track.

Contact Information

Name
Lori Urbanek
Agency Name
City of Santa Rosa
Contact Types
Lead/Public Agency

Location

Cities
Santa Rosa
Counties
Sonoma
Cross Streets
Hearn Avenue/Whitewood Drive and Hearn Avenue/Victoria Drive
Zip
95407
State Highways
U.S. 101
Railways
SMART
Schools
Meadow View ES,Roseland ES,Taylor Mountain ES, Midrose HS
Waterways
Colgan Creek
Township
7N
Range
8W
Section
29
Base
USGS

Notice of Determination

Approving Agency
City of Santa Rosa
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print