Tully Road Bridge (29C-270) Replacement Project

3 Documents in Project

Summary

SCH Number
2009012072
Lead Agency
San Joaquin County
Document Title
Tully Road Bridge (29C-270) Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
7/2/2009
Present Land Use
GP: Resource Conservation (OS/RC), Low Density Residential (R/L(, and General Agricultural (A/G) Z: General Agriculture (AG) and Agriculture-Urban Reserve (AU).
Document Description
The project footprint/limit encompasses approximately 3.57 +/- acres and includes the existing bridge to be replaced; a portion to conform to the new bridge elevation; temporary construction easement; right-of-way acquisitions; and staging area in the existing roadway. The extent of the project footprint/limit is as shown in Figure 2. Tully Road and the existing bridge will be closed during the construction and a ¾ +/- mile detour will be provided by Brandt Road, Jack Tone Road, and Hammond Street. The road will be closed at the end of the project footprint/limit to all traffic and the detour signs placed a week prior to construction. This project is scheduled for construction gaining in June 2010.

Contact Information

Name
Mark Hopkins
Agency Name
San Joaquin County
Contact Types
Lead/Public Agency

Location

Counties
San Joaquin
Cross Streets
Brandt Road / Tully Road
Zip
95237
Total Acres
~3.57
Parcel #
01906024/01096025
State Highways
88/12
Schools
Lockeford ES
Waterways
Bear Creek / Mokelumne River
Township
4N
Range
8E
Section
31
Other Location Info
Lockeford

Notice of Determination

Approving Agency
San Joaquin County Department of Public Works
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes